Skip to content

Installation of TAWs equipment for Stadler 755 fleet

IMG_20191213_180515 (002)

Gemini Rail Technology (GRT) were selected by Taylor Airey to remove the TAWs equipment from the current class 15x DMU fleets operating on the Marks Tey to Sudbury line.

The purpose for this removal was to install the existing equipment on to the new Stadler class 755 fleets that will now operate on this route. GRT created a new installation design package, purchased the installation equipment and have now fitted the TAWs equipment modules onto the new Stadler vehicles at Crown Point depot in Norwich.

The best recommendation we could have was when the client explained that the equipment looks like it has always been there. A fantastic job – very well done to all involved!